Published on HamptonRoads.com | PilotOnline.com (http://hamptonroads.com)
Work scheduled for light at Chesapeake intersection

CHESAPEAKE

The traffic signal at the intersection of Hill Crest and Edinburgh parkways will be temporarily shut down from 9 a.m. today until 5 p.m. Friday, according to Tammy Barry, a Public Works spokeswoman. The signals will be down to allow work crews to relocate equipment due to construction in the area.

The intersection will utilize temporary four-way stop signs during the relocation project. Motorists should be alert to slow traffic and equipment in the work area, Barry said.


Source URL (retrieved on 07/19/2008 - 20:29): http://hamptonroads.com/2008/04/work-scheduled-light-chesapeake-intersection